“Six temporary buildings used during the construction of the Portsmouth Area A-plant will be sold at auction Monday.”
“Sealed bids will be opened at 1 PM in the plant administration building. The buildings are to be razed and moved from the site.”
“All are of frame construction. The sale includes plumbing, heating and electrical fixtures.”
“The big million-dollar administration building, the cafeteria, employment office and hospital building, steam plant, locomotive repair shop, sheet metal fabrication shop and a fire station are included in the sale.”1